A new passenger transport system is planned for the connection of the new Am ende gelegen 3 and the existing terminals 1 and 2. It will use a track which is separate from the existing SkyLine people mover but will allow for interchanges between them. The airport did not emerge https://edgarqwae85184.mappywiki.com/798334/5_einfache_techniken_für_flughafen